Bangabandhu Bridge
25-km tailback on Dhaka-Tangail highway
25-km tailback on Dhaka-Tangail highway
Due to the breakdown of several vehicles on the Bangabandhu bridge, a 25-kilometre long tailback was created on Dhaka-Tangail highway on Tuesday. As a result, the holidaymakers are in trouble on their Eid journey.
17km traffic jam on Dhaka-Tangail highway
17km traffic jam on Dhaka-Tangail highway
As a result of the ongoing road development work at Airport-Azampur portion, a long tailback has been created on the Dhaka-Tangail highway, stretching over an area of about 17 km, leaving the drivers and passengers of vehicles amid immense sufferings.